Search plants, projects, owners, and states
201 MW Wind operating in Logan, CO
201 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2007
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.9410, -103.2590
Reference point reported to EIA.
County
Logan, CO
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 8.895 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Logan Wind Energy LLC | NextEra Energy | — |
| Owner(s) | Logan Wind Energy LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Logan Wind Energy is a 201 MW wind power plant located in Logan County, Colorado. The plant, which began operating in 2007, is owned by NextEra Energy and operated by Logan Wind Energy LLC. It utilizes a single generator consisting of onshore wind turbines manufactured by GE Wind, specifically the GE1.5-77 model, with a rotor diameter of 77 meters and a hub height of 80 meters. The plant is interconnected to the Public Service Company of Colorado balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of record, Logan Wind Energy generated 557,021 MWh, achieving a capacity factor of 31.6%. The plant ranks as the 10th largest wind facility in Colorado out of 21, and 283rd nationally out of 734. Financial data indicates that the plant has a power purchase agreement (PPA) price of $12 per MWh, as reported to FERC.
Grid Region
Mountain West
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Public Service Company of Colorado (PSCO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
65.6K MWh
Latest Month
557.0K MWh
Annual Generation
31.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Logan Wind Energy LLC · Data from 2019–2025
$12.0/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
1 buyer • 28 active contracts
Last updated 2026-05-31
View all articlesMax 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.