Search plants, projects, owners, and states
9 MW Wind operating in Cascade, MT
9 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2006
Operating Since
Coordinates
47.5007, -111.4379
County
Cascade, MT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cycle Holdings, LLC | — | — |
| Owner(s) | Cycle Holdings, LLC | — | — |
| Status | Operating | — | — |
Horseshoe Bend Wind Park is a 9 MW wind power facility located in Cascade County, Montana. The plant began operating in 2006 and is owned and operated by Cycle Holdings, LLC. It utilizes a single onshore wind turbine manufactured by GE Wind, model GE1.5-77. The turbine has a rotor diameter of 77 meters and a hub height of 80 meters.
The facility's primary fuel source is wind (WND). In its latest year of reported generation, Horseshoe Bend Wind Park produced 108 MWh of electricity, achieving a capacity factor of 0.1%. The plant operates within the NorthWestern Energy (NWMT) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Horseshoe Bend Wind Park is ranked as the 24th largest wind farm out of 25 in Montana, and 1179th out of 1424 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
NorthWestern Energy (NWMT) (NWMT)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
9 MWh
Latest Month
108 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $17.1M
Market Position
LMP Node
Horseshu_Lnode
Pricing Hub
—
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Horseshoe Bend Wind Park