Search plants, projects, owners, and states
13.2 MW Solar operating in Clark, NV
13.2 MW
Nameplate Capacity
3
Generators
units
Solar Photovoltaic
Technology
2007
Operating Since
Coordinates
36.2603, -115.0544
County
Clark, NV
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solar Star NAFB LLC | — | — |
| Owner(s) | Solar Star NAFB LLC | — | — |
| Status | Operating | operating | — |
The Nellis Solar Power Plant is a 14-megawatt (MW) photovoltaic power station located within Nellis Air Force Base. The power plant was inaugurated in a ceremony on December 17, 2007, with Nevada Governor Jim Gibbons activating its full operation.
Read more on WikipediaThe Nellis Air Force Base Solar Array is a 13.2 MW solar photovoltaic power plant located in Clark County, Nevada. The plant began operating in 2007 and is owned and operated by Solar Star NAFB LLC. It utilizes single-axis tracking technology. As of the most recent data, the plant ranks 39th out of 52 solar facilities in Nevada and 1720th nationally out of 7108.
The plant consists of 3 generators and uses solar energy as its primary fuel source. The Nellis Air Force Base Solar Array operates within the Nevada Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant's latest annual generation was 23,764 MWh, resulting in a capacity factor of 20.5%. Financial data is available for the facility from LBNL Solar.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Nevada Power Company (NEVP)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
1.4K MWh
Latest Month
23.8K MWh
Annual Generation
20.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2007–2024
$10.6/MWh
Energy Value
$9.2/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
Last updated 2026-03-26
View all 7 articlesNo Ask reports yet for this entity.
Ask about Nellis Air Force Base Solar ArrayForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo