Search plants, projects, owners, and states
4 MW Landfill Gas operating in Winnebago, IA
4 MW
Nameplate Capacity
5
Generators
units
Landfill Gas
Technology
2006
Operating Since
Coordinates
43.3864, -93.5589
County
Winnebago, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | — | — |
Lake Mills Gas Recovery is a 4 MW landfill gas power plant located in Winnebago County, Iowa. The plant began operating in 2006 and has 5 generators utilizing landfill gas as its primary fuel source. It is owned by Waste Management, with WM Renewable Energy LLC listed as the operator per EIA data.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) market and balancing authority. In the most recent year of reported data, Lake Mills Gas Recovery generated 24,802 MWh, achieving a capacity factor of 70.6%. The plant is ranked second out of two landfill gas plants in the state of Iowa, and 143rd out of 284 landfill gas plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
7.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.2K MWh
Latest Month
24.8K MWh
Annual Generation
70.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.401 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
54.8%
Annual Net Gen
19 GWh
CO₂eq
0.000 lb/MWh
Subregion
MRO West
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $14.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
Dairyland Power Coop
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lake Mills Gas RecoveryForward forecasts, scenario decomposition, and risk-decision tooling for this asset.