Search plants, projects, owners, and states
21.8 MW Kerosene operating in Litchfield, CT
21.8 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1967
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
41.7762, -73.1212
County
Litchfield, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Connecticut Jet Power LLC | — | — |
| Owner(s) | Connecticut Jet Power LLC | — | — |
| Status | Operating | — | — |
Torrington Terminal is a 21.8 MW petroleum liquids-fueled power plant located in Litchfield County, Connecticut. The plant began operating in 1967 and has one generator. It is owned and operated by Connecticut Jet Power LLC. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, Torrington Terminal generated 146 MWh of electricity, resulting in a capacity factor of 0.1%. The plant is ranked 8th out of 8 power plants in Connecticut and 17th out of 17 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
22 MWh
Latest Month
146 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
20 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.094 lb/MWh
N₂O
0.019 lb/MWh
Capacity Factor
0.0%
Annual Net Gen
0 GWh
CO₂eq
8 lb/MWh
Subregion
NPCC New England
2013
$765/kW
Est. Construction Cost
Total estimated cost: $16.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Torrington Terminal Substation · 115 kV
Substation Distance
0.03 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.TORRNGTN13.2
Pricing Hub
.Z.CONNECTICUT
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about TorringtonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.