Search plants, projects, owners, and states
5 MW Landfill Gas operating in Sussex, DE
5 MW
Nameplate Capacity
5
Generators
units
Landfill Gas
Technology
2006
Operating Since
Coordinates
38.5992, -75.4342
County
Sussex, DE
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AMERESCO Delaware South | — | — |
| Owner(s) | AMERESCO Delaware South | — | — |
| Status | Operating | — | — |
Ameresco Delaware South is a 5 MW power plant located in Sussex County, Delaware. The facility, which began operating in 2006, is owned and operated by AMERESCO Delaware South. It utilizes landfill gas (LFG) as its primary fuel source and consists of five generators employing landfill gas technology. The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region.
In terms of its role within the state's power generation landscape, Ameresco Delaware South is the second-largest of three landfill gas plants operating in Delaware. Nationally, it ranks as the 105th largest among 284 landfill gas plants. The plant's latest annual generation was 3,380 MWh, resulting in a capacity factor of 7.7%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
284 MWh
Latest Month
3.4K MWh
Annual Generation
7.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.353 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
67.6%
Annual Net Gen
30 GWh
CO₂eq
0.000 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $17.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Conaway Substation · 138 kV
Substation Distance
< 10 km
Operator
Delmarva Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Alt. Hub / Zone
DOMINION HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Ameresco Delaware SouthForward forecasts, scenario decomposition, and risk-decision tooling for this asset.