3 MW Landfill Gas operating in Rock, WI
3 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
2004
Operating Since
Coordinates
43.0533, -74.3082
County
Rock, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AMERESCO Janesville LLC | — | — |
| Owner(s) | AMERESCO Janesville LLC | — | — |
| Status | Operating | — | — |
Ameresco Janesville is a 3 MW landfill gas power plant located in Rock County, Wisconsin. The plant began operating in 2004 and is owned and operated by AMERESCO Janesville LLC. It consists of three generators utilizing landfill gas as its primary fuel source. The plant's location places it within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, and the NERC reliability region of MRO.
In the most recent year of reported data, Ameresco Janesville generated 9,076 MWh of electricity, achieving a capacity factor of 34.4%. The plant is ranked as the 8th largest of 12 landfill gas plants in Wisconsin, and 222nd out of 284 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
724 MWh
Latest Month
9.1K MWh
Annual Generation
34.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.496 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
34.4%
Annual Net Gen
9 GWh
CO₂eq
0.000 lb/MWh
Subregion
MRO East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $10.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
ILLINOIS.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Ameresco JanesvilleForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo