1.7 MW Wind operating in Pipestone, MN
1.7 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2004
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
44.0208, -96.4331
County
Pipestone, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenback Energy, LLC (Longroad) | — | — |
| Owner(s) | Greenback Energy, LLC (Longroad) | — | — |
| Status | Operating | — | — |
Greenback Energy is a 1.7 MW wind power plant located in Pipestone County, Minnesota. The plant began operating in 2004 and is owned and operated by Greenback Energy, LLC (Longroad). It utilizes a single onshore wind turbine. The plant is interconnected to the Midcontinent Independent Transmission System Operator (MISO) and is within the MRO NERC region.
The facility's turbine is a Vestas V82-1.65 model, featuring a rotor diameter of 82 meters and a hub height of 70 meters. In the most recent year of data, Greenback Energy generated 4,915 MWh of electricity, achieving a capacity factor of 33.0%. Greenback Energy ranks 106th out of 123 wind plants in Minnesota and 1357th out of 1424 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
338 MWh
Latest Month
4.9K MWh
Annual Generation
33.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $3.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.UILK1
Pricing Hub
MINN.HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Greenback EnergyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.