Search plants, projects, owners, and states
411.4 MW Natural Gas operating in St Lucie, FL
411.4 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combined Cycle
Technology
2008
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
27.3842, -80.3771
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
St Lucie, FL
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 4.601 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Fort Pierce Utilities Authority | — | — |
| Owner(s) | Florida Municipal Power Agency (FL) | — | — |
| Status | Operating | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Treasure Coast Energy Center is a 411.4 MW natural gas-fired combined cycle power plant located in St. Lucie County, Florida. The plant began operating in 2008 and is owned by the Florida Municipal Power Agency, with the Fort Pierce Utilities Authority serving as the operator. It consists of two generators utilizing combined cycle technology. The plant is ranked 38th out of 51 power plants in Florida and 541st out of 945 nationally.
In the most recent year with available data, Treasure Coast Energy Center generated 1,747,585 MWh of electricity, achieving a capacity factor of 48.4%. The plant operates within the Florida Municipal Power Pool balancing authority and is situated in the SERC NERC region.
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Municipal Power Pool (FMPP)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
151.4K MWh
Latest Month
1.7M MWh
Annual Generation
48.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
882 lb/MWh
NOx
0.042 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.016 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
49.6%
Annual Net Gen
1789 GWh
CO₂eq
882 lb/MWh
Subregion
FRCC All
2013
$965/kW
Est. Construction Cost
Total estimated cost: $397.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesDori BQ BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Dori BQ Solar
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Treasure Coast Energy Center
Data-driven briefing on Treasure Coast Energy Center — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.