49.5 MW Wind operating in Burleigh, ND
49.5 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2005
Operating Since
Coordinates
47.1210, -100.7011
County
Burleigh, ND
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Burleigh County Wind LLC | — | — |
| Owner(s) | FPL Energy Burleigh County Wind LLC | — | — |
| Status | Operating | — | — |
FPL Energy Burleigh County Wind is a 49.5 MW wind power plant located in Burleigh County, North Dakota. The plant, which began operating in 2005, is owned and operated by FPL Energy Burleigh County Wind LLC. It consists of two onshore wind turbine generators. The plant is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the MRO NERC region.
The facility utilizes GE Wind GE1.5-77 wind turbines, characterized by a rotor diameter of 77 meters and a hub height of 80 meters. In its most recent year of operation, the plant generated 189,725 MWh of electricity, achieving a capacity factor of 43.7%. FPL Energy Burleigh County Wind ranks as the 34th largest power plant in North Dakota out of 42, and 948th nationally out of 1424 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
17.3K MWh
Latest Month
189.7K MWh
Annual Generation
43.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $93.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
1 buyer • 5 active contracts
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about FPL Energy Burleigh County WindForward forecasts, scenario decomposition, and risk-decision tooling for this asset.