235 MW Wind operating in Guadalupe, NM
235 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2006
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
34.8147, -105.0108
Reference point reported to EIA.
County
Guadalupe, NM
Voltage information is incomplete along this route; the electrical connection remains unconfirmed.
1 mapped line section connects the two facilities over 8.963 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Leeward Asset Management, LLC | Iberdrola Australia | — |
| Owner(s) | Leeward Asset Management, LLC | Leeward Energy | — |
| Status | Operating | retired | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Aragonne Wind LLC is a 235 MW wind power plant located in Guadalupe County, New Mexico. The plant began operating in 2006 and is owned and operated by Leeward Asset Management, LLC. It utilizes two onshore wind turbine generators. The primary fuel source is wind (WND). Aragonne Wind is the 11th largest wind farm in New Mexico out of 22, and ranks 198th nationally out of 734 wind plants.
The plant's latest annual generation was 614,629 MWh, achieving a capacity factor of 29.9%. The wind turbines have a hub height of 89 meters and a rotor diameter of 127 meters. The turbines were manufactured by GE Wind, model GE2.82-127. Aragonne Wind operates within the Public Service Company of New Mexico balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Public Service Company of New Mexico (PNM)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
85.6K MWh
Latest Month
614.6K MWh
Annual Generation
29.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $445.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-19
View all articlesMax 4 Wind
Data tables and metrics from the InfraSure database.
What is the total generation capacity of Duke Energy's 208 plants, broken down by energy source?
Structured data lookup for Duke Energy with rankings and aggregations.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
GE Renewable Energy announced as turbine technology partner for the 235 MW Aragonne Wind repower selected by Leeward Renewable Energy
sourceLeeward Renewable Energy completed repower and expansion of Aragonne Wind from the original 90 MW to 235 MW using GE turbines
source