3.2 MW Landfill Gas operating in Pendleton, KY
3.2 MW
Nameplate Capacity
4
Generators
units
Landfill Gas
Technology
2007
Operating Since
Coordinates
38.7343, -84.4059
County
Pendleton, KY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | East Kentucky Power Coop, Inc | — | — |
| Owner(s) | East Kentucky Power Coop, Inc | — | — |
| Status | Operating | — | — |
Pendleton County LFGTE is a 3.2 MW landfill gas-fueled power plant located in Pendleton County, Kentucky. The plant began operating in 2007 and is owned and operated by East Kentucky Power Coop, Inc. It consists of four generators utilizing landfill gas technology. The plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region.
In the most recent year of data, Pendleton County LFGTE generated 23,924 MWh of electricity, achieving a capacity factor of 85.1%. The plant is the second-largest of eight landfill gas plants in Kentucky, and ranks 201st out of 284 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.0K MWh
Latest Month
23.9K MWh
Annual Generation
85.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.406 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
82.2%
Annual Net Gen
23 GWh
CO₂eq
0.000 lb/MWh
Subregion
SERC Tennessee Valley
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $11.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
AEP-DAYTON HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Pendleton County LFGTEForward forecasts, scenario decomposition, and risk-decision tooling for this asset.