100.5 MW Wind operating in Martin, MN
100.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2005
Operating Since
Coordinates
43.7947, -94.8590
County
Martin, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid | — |
| Status | Operating | retired | — |
The Trimont Area Wind Farm is a 100.5 MW wind power plant located in Martin County, Minnesota. The plant began operating in 2005 and is owned and operated by Avangrid Power LLC, a subsidiary of Avangrid. It consists of a single generator utilizing onshore wind turbine technology. The facility is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority.
The wind farm's turbines have a hub height of 80 meters and a rotor diameter of 91 meters. The turbines were manufactured by GE Wind, model GE1.6-91. In the most recent year of data, the plant generated 378,939 MWh of electricity, achieving a capacity factor of 43.0%. Trimont Area Wind Farm ranks as the 23rd largest wind farm in Minnesota out of 26, and 710th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
32.2K MWh
Latest Month
378.9K MWh
Annual Generation
43.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $190.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Martin County Substation · 345 kV
Substation Distance
< 10 km
Operator
Great River Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Trimont Area Wind FarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.