735.5 MW Wind operating in Taylor, TX
735.5 MW
Nameplate Capacity
3
Generators
units
Onshore Wind Turbine
Technology
2005
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
32.2140, -100.0571
Reference point reported to EIA.
County
Taylor, TX
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
No suitable mapped facility was found in the area searched. Missing map data does not mean the plant has no grid connection.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Horse Hollow LLC | NextEra Energy | — |
| Owner(s) | FPL Energy Horse Hollow LLC | NextEra Energy | — |
| Status | Operating | retired | — |
Horse Hollow Wind Energy Center is a large wind farm with 735.5 megawatts (MW) of capacity. It consists of 291 GE 1.5-megawatt wind turbines and 139 Siemens 2.3-megawatt wind turbines spread over nearly 47,000 acres (19,000 ha) of land in Taylor and Nolan County, Texas. At the time of its completion in 2006, it was the largest wind farm in the world.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Horse Hollow Wind Energy Center is a 735.5 MW wind farm located in Taylor County, Texas. The facility began operating in 2005 and is owned by NextEra Energy and operated by FPL Energy Horse Hollow LLC. The plant utilizes onshore wind turbine technology and consists of three generators. The wind turbines have a hub height of 80 meters and a rotor diameter of 87 meters, and were manufactured by GE Wind, model GE1.5-87.
In the most recent year of data, Horse Hollow Wind Energy Center generated 2,421,594 MWh of electricity, achieving a capacity factor of 37.6%. The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. Horse Hollow is the second-largest wind farm in Texas out of 200, and ranks tenth nationally out of 734 wind facilities.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Connection unresolved
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
237.7K MWh
Latest Month
2.4M MWh
Annual Generation
37.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $1.4B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Horse Hollow 2 & 3 Switching Station · 138 kV
Substation Distance
0 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
H_HOLLO_WND1
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all 5 articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Parent company NextEra Energy announced ~$67B acquisition of Dominion Energy, which would create the largest US power company.