Search plants, projects, owners, and states
321.2 MW Wind operating in Lewis, NY
321.2 MW
Nameplate Capacity
4
Generators
units
Onshore Wind Turbine
Technology
2005
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
43.7853, -75.5753
Reference point reported to EIA.
County
Lewis, NY
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
No suitable mapped facility was found in the area searched. Missing map data does not mean the plant has no grid connection.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Flat Rock Windpower, LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship | — |
| Owner(s) | Avangrid Power LLC, EDP Renewables North America LLC, Madison Windpower LLC | Avangrid | — |
| Status | Operating | operating | — |
Maple Ridge Wind Farm is the largest wind farm in the state of New York in the United States. Located on Tug Hill in Lewis County, the facility has 195 wind turbines. At full operation, the turbines can produce a maximum of 321.75 megawatts (MW) of electricity.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Maple Ridge Wind Farm is a 321.2 MW wind power plant located in Lewis County, New York. The facility began operating in 2005 and is owned by Avangrid. The operator listed with the EIA is Flat Rock Windpower, LLC. The plant utilizes four onshore wind turbines. Maple Ridge Wind Farm is the fourth-largest wind farm in New York State out of 22, and ranks 65th nationally out of 734 wind farms.
The wind farm's turbines are manufactured by Vestas, model V82-1.65, with a rotor diameter of 82 meters and a hub height of 80 meters. The plant's primary fuel is wind (WND). In the most recent year of reported data, Maple Ridge Wind Farm generated 698,101 MWh of electricity, achieving a capacity factor of 24.8%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Connection unresolved
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
87.0K MWh
Latest Month
698.1K MWh
Annual Generation
24.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $608.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NORTH
Node Source
Plant coordinates only
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesKCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Max 4 Wind
Data tables and metrics from the InfraSure database.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.