Search plants, projects, owners, and states
3.6 MW Distillate Oil operating in Stanly, NC
3.6 MW
Nameplate Capacity
2
Generators
units
Petroleum Liquids
Technology
2006
Operating Since
Coordinates
35.4072, -80.1518
County
Stanly, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Carolina Mun Power Agny #1 | — | — |
| Owner(s) | North Carolina Mun Power Agny #1 | — | — |
| Status | Operating | — | — |
Albemarle Prime Power Park is a 3.6 MW petroleum-fueled power plant located in Stanly County, North Carolina. The plant began operating in 2006 and consists of two generators utilizing petroleum liquids technology. It is owned and operated by North Carolina Municipal Power Agency #1.
The plant operates within the Duke Energy Carolinas balancing authority and the SERC NERC region. In the most recent year with available data, Albemarle Prime Power Park generated 90 MWh of electricity, resulting in a capacity factor of 0.3%. The plant's relatively small size results in a ranking of 15th out of 45 similar plants in North Carolina, and 636th out of 886 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Carolinas (DUK)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
4 MWh
Latest Month
90 MWh
Annual Generation
0.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
4083 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
75 lb/MWh
SO₂
7 lb/MWh
CH₄
0.165 lb/MWh
N₂O
0.033 lb/MWh
Capacity Factor
0.2%
Annual Net Gen
0 GWh
CO₂eq
4097 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$765/kW
Est. Construction Cost
Total estimated cost: $2.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Albemarle Prime Power ParkForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo