Search plants, projects, owners, and states
2 MW Wind operating in Pipestone, MN
2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2003
Operating Since
Coordinates
43.9804, -96.2212
County
Pipestone, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tofteland Windfarm LLC | — | — |
| Owner(s) | Tofteland Windfarm LLC | — | — |
| Status | Operating | — | — |
Tofteland Windfarm LLC is a 2 MW wind power plant located in Pipestone County, Minnesota. The facility, identified by plant ID 56202, began operating in 2003 and utilizes a single onshore wind turbine. The plant is owned and operated by Tofteland Windfarm LLC.
The plant's latest annual generation was 288 MWh, resulting in a capacity factor of 1.6%. Tofteland Windfarm operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. Within Minnesota, the plant ranks 82nd out of 123 power plants, and nationally it ranks 1306th out of 1424. The plant's NERC region is MRO.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
24 MWh
Latest Month
288 MWh
Annual Generation
1.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $3.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
Shared substation inference
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Tofteland Windfarm LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.