2 MW Distillate Oil operating in Polk, IA
2 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
2000
Operating Since
Coordinates
41.6014, -93.5765
County
Polk, IA
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Anderson Erickson Dairy | — | — |
| Owner(s) | Anderson Erickson Dairy | — | — |
| Status | Operating | — | — |
The Anderson Erickson plant is a 2 MW electricity generation facility located in Polk County, Iowa. The plant began operating in 2000 and is owned and operated by Anderson Erickson Dairy. It utilizes a single generator fueled by distillate fuel oil (DFO) and is classified under the technology of petroleum liquids.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. In terms of size, the Anderson Erickson plant is ranked 79th out of 90 power plants in Iowa, and 744th out of 886 plants nationally. The latest annual generation data indicates an output of 19 MWh, resulting in a capacity factor of 0.1%.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial Non-CHP
1 MWh
Latest Month
19 MWh
Annual Generation
0.1%
Capacity Factor
CO₂ Intensity
2456 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
49 lb/MWh
SO₂
4 lb/MWh
CH₄
0.099 lb/MWh
N₂O
0.020 lb/MWh
Capacity Factor
0.2%
Annual Net Gen
0 GWh
CO₂eq
2464 lb/MWh
Subregion
MRO West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $1.5M
Market Position
ISO/RTO Market
MISO
LMP Node
DOES NOT HAVE NODE
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Anderson Erickson