22.5 MW Landfill Gas operating in Middlesex, NJ
22.5 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
1961
Operating Since
Coordinates
40.4903, -74.3156
County
Middlesex, NJ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Middlesex County Utilities Authority - (NJ) | Middlesex County Utilities Authority | — |
| Owner(s) | Middlesex County Utilities Authority | Middlesex County Utilities Authority | — |
| Status | Operating | operating | — |
The Middlesex County Utilities Authority (MCUUA) is a 22.5 MW landfill gas (LFG) power plant located in Middlesex County, New Jersey. The plant began operating in 1961 and is owned and operated by the Middlesex County Utilities Authority. It consists of three generators utilizing landfill gas as its primary fuel source. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
In the most recent year with available data, the Middlesex County Utilities Authority plant generated 107,767 MWh of electricity, achieving a capacity factor of 54.7%. The plant is ranked as the largest of six landfill gas power plants in the state of New Jersey, and 9th out of 284 such plants nationally. The plant has been the subject of 10 news articles, with 6 focusing on regulatory matters and 4 covering industry-related topics.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
IPP CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
9.8K MWh
Latest Month
107.8K MWh
Annual Generation
54.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.200 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
50.4%
Annual Net Gen
99 GWh
CO₂eq
0.001 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $78.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
WOODBRDG18 KV CT-1A
Pricing Hub
WESTERN HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Middlesex County Utilities AuthorityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.