Search plants, projects, owners, and states
21.8 MW Kerosene operating in Litchfield, CT
21.8 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1968
Operating Since
Coordinates
41.7989, -73.1162
County
Litchfield, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Connecticut Jet Power LLC | — | — |
| Owner(s) | Connecticut Jet Power LLC | — | — |
| Status | Operating | — | — |
The Franklin Drive power plant is a 21.8 MW petroleum liquids-fueled facility located in Litchfield County, Connecticut. It began operating in 1968 and has one generator. The plant is owned and operated by Connecticut Jet Power LLC. It operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, Franklin Drive generated 118 MWh of electricity, resulting in a capacity factor of 0.1%. The plant is ranked as the 7th largest of 8 petroleum-fueled plants in Connecticut, and 16th of 17 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
18 MWh
Latest Month
118 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
16 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.101 lb/MWh
N₂O
0.020 lb/MWh
Capacity Factor
0.1%
Annual Net Gen
0 GWh
CO₂eq
8 lb/MWh
Subregion
NPCC New England
2013
$765/kW
Est. Construction Cost
Total estimated cost: $16.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Franklin Drive Substation · 115 kV
Substation Distance
0.072 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.FRNKLNDR13.2
Pricing Hub
.Z.CONNECTICUT
Location Type
NETWORK NODE