102 MW Wind operating in Woodward, OK
102 MW
Nameplate Capacity
2
Generators
units
Onshore Wind Turbine
Technology
2003
Operating Since
Coordinates
36.5817, -99.2988
County
Woodward, OK
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Oklahoma Wind LLC | NextEra Energy | — |
| Owner(s) | FPL Energy Oklahoma Wind LLC, FPL Energy Sooner Wind LLC | NextEra Energy | — |
| Status | Operating | retired | — |
The Oklahoma Wind Energy Center is a 102 MW wind power plant located in Woodward County, Oklahoma. The plant began operating in 2003 and is owned by NextEra Energy and operated by FPL Energy Oklahoma Wind LLC. It consists of two onshore wind turbine generators. The facility utilizes GE Wind turbines, specifically the GE1.5-82.5 model, with a rotor diameter of 82.5 meters and a hub height of 80 meters.
The plant's latest annual generation was 145,380 MWh, resulting in a capacity factor of 16.3%. The Oklahoma Wind Energy Center operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. It is ranked as the 51st largest wind farm in Oklahoma out of 57, and 689th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
10.2K MWh
Latest Month
145.4K MWh
Annual Generation
16.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $193.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Oklahoma Wind Energy Center Substation
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP South Hub
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26