Search plants, projects, owners, and states
20.5 MW Distillate Oil operating in Rockingham, VA
20.5 MW
Nameplate Capacity
3
Generators
units
Petroleum Liquids
Technology
1997
Operating Since
Coordinates
38.4008, -78.8975
County
Rockingham, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Harrisonburg - (VA) | — | — |
| Owner(s) | City of Harrisonburg - (VA) | — | — |
| Status | Operating | — | — |
The Pleasant Valley plant is a 20.5 MW petroleum-fueled power plant located in Rockingham County, Virginia. The plant began operating in 1997 and is owned and operated by the City of Harrisonburg. It consists of three generators utilizing petroleum liquids as their primary fuel source. Pleasant Valley is connected to the PJM Interconnection, LLC balancing authority and resides within the SERC NERC region.
In the most recent year of data, the plant generated 956 MWh of electricity, resulting in a capacity factor of 0.5%. Pleasant Valley ranks as the 8th largest of 32 petroleum-fueled plants in Virginia and 192nd out of 886 such plants nationally. The plant has been mentioned in eight news articles, covering topics such as industry trends, regulatory matters, hazards, and deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
23.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
34 MWh
Latest Month
956 MWh
Annual Generation
0.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2403 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
19 lb/MWh
SO₂
7 lb/MWh
CH₄
0.097 lb/MWh
N₂O
0.019 lb/MWh
Capacity Factor
0.5%
Annual Net Gen
1 GWh
CO₂eq
2411 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$765/kW
Est. Construction Cost
Total estimated cost: $15.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
HARRSNBG35 KV TX1
Pricing Hub
DOMINION HUB
Location Type
Load Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Pleasant Valley (VA)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.