3.2 MW Distillate Oil operating in Southampton, VA
3.2 MW
Nameplate Capacity
2
Generators
units
Petroleum Liquids
Technology
1992
Operating Since
Coordinates
42.5079, -90.6583
County
Southampton, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Franklin - (VA) | — | — |
| Owner(s) | City of Franklin - (VA) | — | — |
| Status | Operating | — | — |
The Downtown power plant, identified by plant ID 55954, is located in Southampton County, Virginia. It is owned and operated by the City of Franklin (VA). The plant's primary fuel source is distillate fuel oil (DFO), and it utilizes petroleum liquids technology. Commissioned in 1992, the facility has a total capacity of 3.2 MW distributed across two generators.
In terms of grid context, the Downtown plant operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. The plant's latest annual generation was 384 MWh, resulting in a capacity factor of 1.4%. Based on capacity, the Downtown plant ranks 25th out of 32 power plants in Virginia and 650th out of 886 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
13.2 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
13 MWh
Latest Month
384 MWh
Annual Generation
1.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1360 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
26 lb/MWh
SO₂
2 lb/MWh
CH₄
0.055 lb/MWh
N₂O
0.011 lb/MWh
Capacity Factor
0.8%
Annual Net Gen
0 GWh
CO₂eq
1365 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$765/kW
Est. Construction Cost
Total estimated cost: $2.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
UNIONCMP13 KV UNIONCP9
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about DowntownForward forecasts, scenario decomposition, and risk-decision tooling for this asset.