18 MW Wood Waste operating in Grays Harbor, WA
18 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2003
Operating Since
Coordinates
46.9698, -123.7739
County
Grays Harbor, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sierra Pacific Industries | Sierra Pacific Industries Inc | — |
| Owner(s) | Sierra Pacific Industries | Sierra Pacific Industries | — |
| Status | Operating | operating | — |
Sierra Pacific Aberdeen is a biomass power plant located in Grays Harbor County, Washington. The plant has a total capacity of 18 MW and began operating in 2003. It is owned and operated by Sierra Pacific Industries, utilizing wood and wood waste as its primary fuel source. The plant consists of a single generator.
In the latest year of reported generation, Sierra Pacific Aberdeen produced 128,350 MWh of electricity, achieving a capacity factor of 81.1%. The plant operates within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Among biomass plants in Washington, Sierra Pacific Aberdeen ranks 2nd out of 4, and it holds a national ranking of 67 out of 97 similar facilities.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10.9K MWh
Latest Month
128.3K MWh
Annual Generation
81.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.537 lb/MWh
SO₂
0.134 lb/MWh
CH₄
0.379 lb/MWh
N₂O
0.050 lb/MWh
Capacity Factor
66.7%
Annual Net Gen
105 GWh
CO₂eq
24 lb/MWh
Subregion
WECC Northwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $62.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Sierra Pacific AberdeenForward forecasts, scenario decomposition, and risk-decision tooling for this asset.