48 MW Natural Gas operating in Solano, CA
48 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2003
Operating Since
Coordinates
38.2281, -122.0751
County
Solano, CA
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Gilroy Energy Center LLC | — | — |
| Owner(s) | Gilroy Energy Center LLC | — | — |
| Status | Operating | — | — |
Wolfskill Energy Center is a 48 MW natural gas-fired power plant located in Solano County, California. The plant began operating in 2003 and consists of a single natural gas-fired combustion turbine generator. Gilroy Energy Center LLC is the listed operator per EIA data. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of reported data, the plant generated 7,416 MWh of electricity, resulting in a capacity factor of 1.8%. Based on total capacity, Wolfskill Energy Center ranks as the 126th largest power plant in California out of 297, and 1129th nationally out of 1963.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
669 MWh
Latest Month
7.4K MWh
Annual Generation
1.8%
Capacity Factor
CO₂ Intensity
1333 lb/MWh
NOx
0.237 lb/MWh
SO₂
0.005 lb/MWh
CH₄
0.024 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
1.9%
Annual Net Gen
8 GWh
CO₂eq
1334 lb/MWh
Subregion
WECC California
2013
$965/kW
Est. Construction Cost
Total estimated cost: $46.3M
Market Position
ISO/RTO Market
CAISO
LMP Node
NP-15
Pricing Hub
TH_NP15_GEN-APND
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Wolfskill Energy Center