Search plants, projects, owners, and states
42 MW Wind operating in Cerro Gordo, IA
42 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1999
Operating Since
Coordinates
43.0472, -93.4775
County
Cerro Gordo, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hawkeye Power Partners LLC | — | — |
| Owner(s) | Shaw Creek Solar | — | — |
| Status | Operating | operating | — |
Hawkeye Power Partners LLC is a 42 MW wind power plant located in Cerro Gordo County, Iowa. The plant, which began operating in 1999, is owned and operated by Hawkeye Power Partners LLC. It consists of a single generator utilizing onshore wind turbine technology. The facility ranks 73rd out of 122 power plants in Iowa and 970th out of 1424 nationally.
The plant's wind turbines have a hub height of 55 meters and a rotor diameter of 48 meters. The turbines were manufactured by NEG Micon and are model NM48. In its latest year of reported generation, the plant produced 176,054 MWh, achieving a capacity factor of 47.8%. The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
12.7K MWh
Latest Month
176.1K MWh
Annual Generation
47.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $79.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.CERROG1
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
1 buyer • 1 active contract
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Hawkeye Power Partners LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.