Search plants, projects, owners, and states
9.9 MW Landfill Gas operating in Northampton, PA
9.9 MW
Nameplate Capacity
3
Generators
units
Landfill Gas
Technology
2001
Operating Since
Coordinates
40.8591, -75.2628
County
Northampton, PA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Waste Management Inc | — | — |
| Owner(s) | Green Knight Economic Development Corpor | — | — |
| Status | Operating | — | — |
Green Knight Energy Center is a 9.9 MW landfill gas-fueled power plant located in Northampton County, Pennsylvania. The facility, which began operating in 2001, is owned and operated by Waste Management Inc. It consists of three generators utilizing landfill gas technology. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority, which falls under the RFC NERC region.
In the most recent year of data, Green Knight Energy Center generated 41,286 MWh of electricity, achieving a capacity factor of 47.5%. The plant is a significant contributor to landfill gas-based power generation, ranking 4th out of 23 such facilities in Pennsylvania and 35th out of 284 nationwide.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.3K MWh
Latest Month
41.3K MWh
Annual Generation
47.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.709 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
50.7%
Annual Net Gen
44 GWh
CO₂eq
0.000 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $34.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Green Knight Energy CenterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.