Search plants, projects, owners, and states
92.2 MW Natural Gas operating in Kings, CA
92.2 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2001
Operating Since
Coordinates
36.2701, -119.6480
County
Kings, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MRP San Joaquin Energy LLC. | — | — |
| Owner(s) | MRP San Joaquin Energy LLC. | — | — |
| Status | Operating | — | — |
Hanford Energy Park Peaker is a 92.2 MW natural gas-fired power plant located in Kings County, California. The plant began operating in 2001 and is owned and operated by MRP San Joaquin Energy LLC. It consists of two natural gas-fired combustion turbine generators. The plant is located within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of reported data, Hanford Energy Park Peaker generated 2,981 MWh of electricity, resulting in a capacity factor of 0.4%. The plant ranks 81st in size out of 297 power plants in California, and 969th nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
3.0K MWh
Annual Generation
0.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1252 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
0.188 lb/MWh
SO₂
0.002 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
0.5%
Annual Net Gen
4 GWh
CO₂eq
1254 lb/MWh
Subregion
WECC California
2013
$965/kW
Est. Construction Cost
Total estimated cost: $89.0M
Market Position
ISO/RTO Market
CAISO
LMP Node
GWFPWR_1_UNITS-APND
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Aggregated Node
Node Source
EIA-860 direct report
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Hanford Energy Park Peaker