Search plants, projects, owners, and states
No longer in EIA's lists of operating or planned plants. Last listed in January 2026. EIA-860M · Sep 2026
90 MW Natural Gas in Caddo, OK
90 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2001
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
35.0833, -98.2264
County
Caddo, OK
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Western Farmers Elec Coop, Inc | — | — |
| Owner(s) | Western Farmers Elec Coop, Inc | — | — |
| Status | No longer listed | — | — |
WFEC GenCo LLC is a 90 MW natural gas-fired power plant located in Caddo County, Oklahoma. The plant began operating in 2001 and is owned and operated by Western Farmers Electric Cooperative, Inc. It consists of two natural gas-fired combustion turbine generators. The plant is located within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
In the most recent year of data, WFEC GenCo LLC generated 83,680 MWh of electricity, achieving a capacity factor of 10.6%. Based on capacity, the plant ranks 27th out of 38 power plants in Oklahoma and 974th out of 1963 plants nationally. Recent news coverage related to the plant has focused on hazards.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
—
Balancing Authority
—
Grid Voltage
—
Regulatory Status
—
Entity Type
Cooperative
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
6.5K MWh
Latest Month
83.7K MWh
Annual Generation
10.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1732 lb/MWh
NOx
5 lb/MWh
SO₂
0.047 lb/MWh
CH₄
0.033 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
14.6%
Annual Net Gen
115 GWh
CO₂eq
1733 lb/MWh
Subregion
SPP South
2013
$965/kW
Est. Construction Cost
Total estimated cost: $86.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPPSOUTH_HUB
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about WFEC GenCo LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.