278 MW Wind operating in Upton, TX
278 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2001
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
31.2092, -102.2417
Reference point reported to EIA.
County
Upton, TX
Nearby Plants
The available map data does not yet establish a route from this plant to the grid.
No suitable mapped facility was found in the area searched. Missing map data does not mean the plant has no grid connection.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Upton Wind LP | NextEra Energy | — |
| Owner(s) | FPL Energy Upton Wind LP | NextEra Energy | — |
| Status | Operating | operating | — |
The King Mountain Wind Farm is a 278.2 megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 750 GW·h. The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
King Mountain Wind Ranch 1 is a 278 MW wind power plant located in Upton County, Texas. The plant began operating in 2001 and is owned by NextEra Energy and operated by FPL Energy Upton Wind LP. The facility utilizes a single generator consisting of onshore wind turbines manufactured by Siemens Gamesa Renewable Energy, model SG-1.3-65. The wind turbines have a hub height of 60 meters and a rotor diameter of 65 meters.
The plant's primary fuel source is wind (WND). In the most recent year of data, King Mountain Wind Ranch 1 generated 573,485 MWh of electricity, achieving a capacity factor of 23.5%. The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. King Mountain Wind Ranch 1 ranks as the 41st largest wind farm in Texas out of 200, and 135th nationally out of 734.
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Connection unresolved
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
45.8K MWh
Latest Month
573.5K MWh
Annual Generation
23.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $526.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
King Mountain Southwest Substation · 138 kV
Substation Distance
0 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
KINGE_ALL
Pricing Hub
HB_WEST
Alt. Hub / Zone
LZ_WEST
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.