Search plants, projects, owners, and states
3.4 MW Landfill Gas operating in Montgomery, TX
3.4 MW
Nameplate Capacity
2
Generators
units
Landfill Gas
Technology
2003
Operating Since
Coordinates
30.3225, -95.2681
County
Montgomery, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | TX LFG Energy, LP | — | — |
| Owner(s) | TX LFG Energy, LP | — | — |
| Status | Operating | — | — |
The Security power plant, located in Montgomery County, Texas, is a 3.4 MW landfill gas (LFG) fueled facility. It began operating in 2003 and is owned and operated by TX LFG Energy, LP. The plant consists of two generators utilizing landfill gas technology.
Security's latest annual generation was 6,240 MWh, resulting in a capacity factor of 20.9%. The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region. Among landfill gas plants in Texas, Security ranks 4th out of 7, and nationally it ranks 161st out of 284.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
523 MWh
Latest Month
6.2K MWh
Annual Generation
20.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.355 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
51.0%
Annual Net Gen
15 GWh
CO₂eq
0.000 lb/MWh
Subregion
SERC Mississippi Valley
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $11.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Security Substation · 138 kV
Substation Distance
< 10 km
Operator
Sam Houston Electric Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
TEXAS.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-04-09
View all 10 articlesNo Ask reports yet for this entity.
Ask about SecurityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo