Search plants, projects, owners, and states
678.3 MW Natural Gas operating in Muskingum, OH
678.3 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
2012
Operating Since
Coordinates
40.0928, -82.0276
County
Muskingum, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Appalachian Power Co | Appalachian Power | — |
| Owner(s) | Appalachian Power Co | American Electric Power Company | — |
| Status | Operating | — | — |
The Dresden Plant is a 580 megawatt (MW), natural gas power plant located south of Dresden, Ohio in Muskingum County, Ohio. The plant began operations in 2012 and is currently owned by American Electric Power (AEP).
Read more on WikipediaThe Dresden Energy Facility is a 678.3 MW natural gas-fired combined cycle power plant located in Muskingum County, Ohio. The plant began operating in 2012 and consists of 3 generators. It is owned by American Electric Power Company and operated by Appalachian Power Co. The plant operates within the PJM Interconnection balancing authority and the RFC NERC region.
In its most recent year of operation, the Dresden Energy Facility generated 4,189,180 MWh of electricity, achieving a capacity factor of 70.6%. The plant's installed cost was $608.8 per kW, according to FERC data. The Dresden Energy Facility is ranked as the 15th largest power plant in Ohio out of 25, and 337th nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
428.6K MWh
Latest Month
4.2M MWh
Annual Generation
70.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
823 lb/MWh
NOx
0.083 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.016 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
65.8%
Annual Net Gen
3910 GWh
CO₂eq
824 lb/MWh
Subregion
RFC West
Combined cycle · Appalachian Power Company · Data from 2015–2024
$719/kW
Installed Cost
$-716/kW
Annual CapEx
$20.7/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Dresden Substation · 138 kV
Substation Distance
0 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
DRESDEN 18 KV CT1
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Dresden Energy FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.