Search plants, projects, owners, and states
4 MW Hydro operating in Penobscot, ME
4 MW
Nameplate Capacity
5
Generators
units
Conventional Hydroelectric
Technology
1923
Operating Since
Coordinates
45.6075, -68.5448
County
Penobscot, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Brookfield Black Bear Hydro, LLC | — | — |
| Owner(s) | Brookfield Black Bear Hydro, LLC | — | — |
| Status | Operating | — | — |
Medway Hydro is a 4 MW hydroelectric power plant located in Penobscot County, Maine. The plant began operating in 1923 and consists of 5 generators utilizing conventional hydroelectric technology. It is owned and operated by Brookfield Black Bear Hydro, LLC. The plant's primary fuel source is water (WAT).
In the most recent year of reported data, Medway Hydro generated 23,330 MWh of electricity, achieving a capacity factor of 66.5%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Medway Hydro is ranked as the 32nd largest power plant in Maine out of 51 plants, and 958th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
46.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.9K MWh
Latest Month
23.3K MWh
Annual Generation
66.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $9.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.POWERSVL115
Pricing Hub
.Z.MAINE
Location Type
NETWORK NODE
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Medway HydroForward forecasts, scenario decomposition, and risk-decision tooling for this asset.