519 MW Natural Gas operating in Wayne, WV
519 MW
Nameplate Capacity
6
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2001
Operating Since
Coordinates
38.3681, -82.5339
County
Wayne, WV
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Appalachian Power Co | Appalachian Power | — |
| Owner(s) | Appalachian Power Co | American Electric Power Company | — |
| Status | Operating | — | — |
Ceredo Generating Station is a 519 MW natural gas-fired power plant located in Wayne County, West Virginia. The plant, which began operating in 2001, is owned by American Electric Power Company and operated by Appalachian Power Co. It consists of six natural gas-fired combustion turbine generators. The plant is located within the PJM Interconnection balancing authority and the RFC NERC region.
In the most recent year with available data, Ceredo Generating Station produced 702,143 MWh of electricity, operating at a capacity factor of 15.4%. The plant ranks as the second largest of five natural gas plants in West Virginia, and 475th out of 945 natural gas plants nationally. Financial data indicates an installed cost of $384.46 per kW, based on FERC filings.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
50.3K MWh
Latest Month
702.1K MWh
Annual Generation
15.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1455 lb/MWh
NOx
0.977 lb/MWh
SO₂
0.008 lb/MWh
CH₄
0.030 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
10.3%
Annual Net Gen
470 GWh
CO₂eq
1457 lb/MWh
Subregion
RFC West
Gas turbine · Appalachian Power Company · Data from 2015–2024
$420/kW
Installed Cost
$-399/kW
Annual CapEx
$32.6/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
TWELVEPO13 KV 1
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all articlesNo Ask reports yet for this entity.
Ask about Ceredo Generating StationForward forecasts, scenario decomposition, and risk-decision tooling for this asset.