6.4 MW Landfill Gas operating in San Diego, CA
6.4 MW
Nameplate Capacity
4
Generators
units
Landfill Gas
Technology
1997
Operating Since
Coordinates
32.8448, -117.1627
County
San Diego, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MM San Diego Energy-Miramar | — | — |
| Owner(s) | MM San Diego Energy-Miramar | — | — |
| Status | Operating | — | — |
MM San Diego-Miramar is a 6.4 MW landfill gas power plant located in San Diego County, California. The plant began operating in 1997 and is owned and operated by MM San Diego Energy-Miramar. It consists of four generators utilizing landfill gas as its primary fuel source. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year of data, MM San Diego-Miramar generated 46,065 MWh of electricity, achieving a capacity factor of 81.9%. Among landfill gas plants in California, MM San Diego-Miramar ranks 12th out of 40 facilities. Nationally, it holds a rank of 84 out of 284 landfill gas power plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP CHP
4.1K MWh
Latest Month
46.1K MWh
Annual Generation
81.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.291 lb/MWh
CH₄
0.002 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
64.0%
Annual Net Gen
36 GWh
CO₂eq
0.104 lb/MWh
Subregion
WECC California
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $22.4M
Point of Interconnection
Nearest Substation
Mesa Heights Substation · 69 kV
Substation Distance
1.767 km
Operator
San Diego Gas & Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
MESAHGTS_6_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about MM San Diego-Miramar