8.8 MW Landfill Gas operating in Macomb, MI
8.8 MW
Nameplate Capacity
9
Generators
units
Landfill Gas
Technology
1998
Operating Since
Coordinates
42.7645, -82.7471
County
Macomb, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NextEra Renewable Fuels, LLC | — | — |
| Owner(s) | NextEra Renewable Fuels, LLC | — | — |
| Status | Operating | — | — |
Pine Tree Acres is an 8.8 MW power plant located in Macomb County, Michigan. The facility, which began operating in 1998, utilizes landfill gas (LFG) as its primary fuel source and consists of nine generators. It is owned and operated by NextEra Renewable Fuels, LLC. The plant is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) and resides within the ReliabilityFirst Corporation (RFC) NERC region.
In the most recent year of reported data, Pine Tree Acres generated 60,438 MWh of electricity, achieving a capacity factor of 78.5%. Among landfill gas power plants in Michigan, Pine Tree Acres ranks as the 4th largest out of 22 facilities. Nationally, it holds the 49th position among 284 landfill gas power plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
120.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
4.6K MWh
Latest Month
60.4K MWh
Annual Generation
78.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.430 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
85.1%
Annual Net Gen
66 GWh
CO₂eq
0.000 lb/MWh
Subregion
RFC Michigan
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $30.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
DECO.PINE_TREE
Pricing Hub
MICHIGAN.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Pine Tree AcresForward forecasts, scenario decomposition, and risk-decision tooling for this asset.