Retired in December 2024, according to EIA. Last listed as operating or planned in January 2026. EIA-860M · Sep 2026
14.4 MW Landfill Gas in Ocean, NJ
14.4 MW
Nameplate Capacity
12
Generators
units
Landfill Gas
Technology
1997
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.0249, -74.2501
Reference point reported to EIA.
County
Ocean, NJ
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
4 mapped line sections connect the two facilities over 21.273 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NextEra Renewable Fuels, LLC | — | — |
| Owner(s) | NextEra Renewable Fuels, LLC | — | — |
| Status | Retired | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Ocean County Landfill is a 14.4 MW landfill gas (LFG) power plant located in Ocean County, New Jersey. The plant began operating in 1997 and is owned and operated by NextEra Renewable Fuels, LLC. It consists of 12 generators utilizing landfill gas technology. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
Ocean County Landfill is a significant LFG energy producer, ranking as the second largest of six such facilities in New Jersey and twelfth out of 284 nationally. The plant's operation and impact have been noted in various news sources, with 10 articles covering topics such as industry trends, regulatory matters, deals, potential hazards, and grid-related issues.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
34.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.367 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
66.4%
Annual Net Gen
84 GWh
CO₂eq
0.000 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $50.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Manchester Substation · 230 kV
Substation Distance
2.828 km
Operator
Jersey Central Power and Light
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
MANCHEST230 KV T2_LOAD
Pricing Hub
WESTERN HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 8 articlesNo Ask reports yet for this entity.
Ask about Ocean County LandfillForward forecasts, scenario decomposition, and risk-decision tooling for this asset.