42 MW Hydro operating in Montgomery, NC
42 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1962
Operating Since
Coordinates
35.4856, -80.1753
County
Montgomery, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eagle Creek Renewable Energy, LLC | — | — |
| Owner(s) | Cube Yadkin Generation LLC | — | — |
| Status | Operating | — | — |
Tuckertown Hydro is a 42 MW hydroelectric power plant located in Montgomery County, North Carolina. The plant began operating in 1962 and utilizes conventional hydroelectric technology. It is owned and operated by Eagle Creek Renewable Energy, LLC. The plant consists of 3 generators and uses water (WAT) as its primary fuel source. Tuckertown Hydro ranks as the 14th largest hydroelectric plant in North Carolina out of 39, and 336th nationally out of 1464.
In the most recent year with available data, Tuckertown Hydro generated 137,581 MWh of electricity, achieving a capacity factor of 37.2%. The plant operates within the balancing authority of Alcoa Power Generating, Inc. - Yadkin Division, and is located within the SERC NERC region. Financial data for Tuckertown Hydro is available from FERC filings.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Alcoa Power Generating, Inc. - Yadkin Division (YAD)
Grid Voltage
100.0 kV
Regulatory Status
RE — Regulated
Entity Type
Independent Power Producer
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
9.7K MWh
Latest Month
137.6K MWh
Annual Generation
37.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Run-of-river hydro · Alcoa Power Generating Inc. · Data from 2015–2016
$9394.6/MWh
Operating Cost
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Tuckertown HydroForward forecasts, scenario decomposition, and risk-decision tooling for this asset.