Search plants, projects, owners, and states
17.5 MW Natural Gas operating in Baltimore City, MD
17.5 MW
Nameplate Capacity
3
Generators
units
Natural Gas Steam Turbine
Technology
1955
Operating Since
Coordinates
39.2746, -76.5950
County
Baltimore City, MD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | American Sugar Refining, Inc. | American Sugar Refining | — |
| Owner(s) | American Sugar Refining, Inc. | American Sugar Refining | — |
| Status | Operating | — | — |
The Domino Sugar Baltimore plant, located in Baltimore City County, Maryland, has a total capacity of 17.5 MW. The plant began operating in 1955 and utilizes natural gas as its primary fuel source, powering three natural gas steam turbine generators. American Sugar Refining, Inc. is the plant's operator. Domino Sugar Baltimore ranks 10th out of 14 power plants in Maryland and 1338th nationally out of 1963 plants.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In the latest year for which data is available, the plant generated 54,190 MWh of electricity, achieving a capacity factor of 35.5%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
3.4K MWh
Latest Month
54.2K MWh
Annual Generation
35.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.164 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.012 lb/MWh
N₂O
0.001 lb/MWh
Capacity Factor
32.4%
Annual Net Gen
50 GWh
CO₂eq
0.672 lb/MWh
Subregion
RFC East
2013
$965/kW
Est. Construction Cost
Total estimated cost: $16.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
CLAREST 34.5 KV BRESCO
Pricing Hub
WESTERN HUB
Alt. Hub / Zone
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Domino Sugar BaltimoreForward forecasts, scenario decomposition, and risk-decision tooling for this asset.