17.6 MW Landfill Gas operating in Seneca, NY
17.6 MW
Nameplate Capacity
18
Generators
units
Landfill Gas
Technology
1996
Operating Since
Coordinates
42.9281, -76.8408
County
Seneca, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Seneca Energy II | — | — |
| Owner(s) | Seneca Energy II | — | — |
| Status | Operating | — | — |
Seneca Energy is a 17.6 MW landfill gas power plant located in Seneca County, New York. The plant began operating in 1996 and is owned and operated by Seneca Energy II. It consists of 18 generators utilizing landfill gas as its primary fuel source. The plant is connected to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
Seneca Energy generated 47,835 MWh in the most recent year of data, achieving a capacity factor of 31.1%. The plant is ranked as the largest of 16 landfill gas facilities in New York state, and 10th out of 284 such facilities nationally. The plant has been the subject of 7 news articles, covering regulatory, industry, and deal-related topics.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.0K MWh
Latest Month
47.8K MWh
Annual Generation
31.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.367 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
61.0%
Annual Net Gen
94 GWh
CO₂eq
0.000 lb/MWh
Subregion
NPCC Upstate NY
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $61.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
NEG CENTRAL___DRP
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
CENTRL
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14