46 MW Natural Gas operating in Kern, CA
46 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
1992
Operating Since
Coordinates
35.4962, -119.0089
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WCAC Operating Company | — | — |
| Owner(s) | WGP Redwood Holdings, LLC | — | — |
| Status | Operating | — | — |
Live Oak Limited is a 46 MW natural gas-fired power plant located in Kern County, California. The plant began operating in 1992 and has one natural gas-fired combustion turbine generator. WCAC Operating Company is the plant's operator. Live Oak Limited is connected to the California Independent System Operator (CAISO) balancing authority and is within the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Live Oak Limited generated 21,065 MWh of electricity, achieving a capacity factor of 5.2%. The plant ranks 141st in size among California's 297 power plants and 1155th nationally out of 1963 plants. Recent news coverage of the plant has focused on hazards.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
343 MWh
Latest Month
21.1K MWh
Annual Generation
5.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
882 lb/MWh
NOx
0.212 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.017 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
7.0%
Annual Net Gen
28 GWh
CO₂eq
883 lb/MWh
Subregion
WECC California
2013
$965/kW
Est. Construction Cost
Total estimated cost: $44.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
BADGERCK_7_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Live Oak LimitedForward forecasts, scenario decomposition, and risk-decision tooling for this asset.