47.4 MW Black Liquor operating in Marengo, AL
47.4 MW
Nameplate Capacity
2
Generators
units
Wood/Wood Waste Biomass
Technology
1982
Operating Since
Coordinates
32.4541, -87.9759
County
Marengo, AL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WestRock Mill Company, LLC | WestRock Mill Company LLC | — |
| Owner(s) | WestRock Mill Company, LLC | Smurfit Westrock | — |
| Status | Operating | operating | — |
The WestRock Demopolis Mill is a 47.4 MW biomass power plant located in Marengo County, Alabama. The plant began operating in 1982 and is owned by Smurfit Westrock, an Irish company. The operator listed with the EIA is WestRock Mill Company, LLC. The plant utilizes two generators powered by wood and wood waste biomass (BLQ).
In the most recent year of data, the WestRock Demopolis Mill generated 312,959 MWh of electricity, achieving a capacity factor of 75.2%. The balancing authority for the plant is Southern Company Services, Inc. - Trans, and it is located within the SERC NERC region. Among biomass plants in Alabama, it ranks 7th out of 9, and nationally it ranks 52nd out of 66.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southern Company Services, Inc. - Trans (SOCO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
26.4K MWh
Latest Month
313.0K MWh
Annual Generation
75.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
59 lb/MWh
NOx
0.905 lb/MWh
SO₂
2 lb/MWh
CH₄
0.150 lb/MWh
N₂O
0.033 lb/MWh
Capacity Factor
70.0%
Annual Net Gen
291 GWh
CO₂eq
72 lb/MWh
Subregion
SERC South
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $165.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
Last updated 2026-03-14