Search plants, projects, owners, and states
6.5 MW Wind operating in Kern, CA
6.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1992
Operating Since
Coordinates
35.0663, -118.3394
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nextera Energy Resources | NextEra Energy | — |
| Owner(s) | Nextera Energy Resources | NextEra Energy | — |
| Status | Operating | operating | — |
Coram Tehachapi is a 6.5 MW wind power plant located in Kern County, California. The plant began operating in 1992 and utilizes onshore wind turbine technology. It has one generator. The facility is owned by NextEra Energy and operated by Nextera Energy Resources.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Coram Tehachapi is ranked as the 87th largest power plant in California out of 116, and nationally it is ranked 1204 out of 1424. The plant's primary fuel source is wind (WND).
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
66.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $12.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
MIDWIND _6_GN001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.