51.4 MW Natural Gas operating in San Diego, CA
51.4 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combined Cycle
Technology
1994
Operating Since
Coordinates
33.1185, -117.0992
County
San Diego, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Goal Line LP | Goal Line | — |
| Owner(s) | Goal Line LP | Onward Energy Holdings | — |
| Status | Operating | — | — |
Goal Line LP is a 51.4 MW natural gas-fired combined cycle power plant located in San Diego County, California. The plant began operating in 1994 and has two generators. It is owned by Onward Energy Holdings and operated by Goal Line LP. The plant is within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Goal Line LP generated 7,397 MWh of electricity, resulting in a capacity factor of 1.6%. The plant ranks 105th in size among California's 297 power plants and 1097th nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP CHP
0 MWh
Latest Month
7.4K MWh
Annual Generation
1.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
873 lb/MWh
NOx
0.112 lb/MWh
SO₂
0.005 lb/MWh
CH₄
0.016 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
3.0%
Annual Net Gen
14 GWh
CO₂eq
874 lb/MWh
Subregion
WECC California
2013
$965/kW
Est. Construction Cost
Total estimated cost: $49.6M
Point of Interconnection
Nearest Substation
Goal Line
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
GOALLINE_6_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
No news articles linked yet for this plant.