91.5 MW Geothermal operating in Imperial, CA
91.5 MW
Nameplate Capacity
5
Generators
units
Geothermal
Technology
2006
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
32.7134, -115.5179
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Imperial, CA
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
5 mapped line sections connect the two facilities over 2.559 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ORCAL Geothermal, Inc | ORCAL Geothermal | — |
| Owner(s) | Ormat Nevada Inc | Ormat Technology Inc | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Heber Geothermal is a 91.5 MW geothermal power plant located in Imperial County, California. The plant, which began operating in 2006, is owned and operated by ORCAL Geothermal, Inc. It consists of 5 generators utilizing geothermal technology and is interconnected with the Imperial Irrigation District balancing authority in the Western Electricity Coordinating Council (WECC) region.
In the most recent year of reported data, Heber Geothermal generated 384,859 MWh of electricity, achieving a capacity factor of 47.9%. The plant is a significant geothermal energy producer, ranking 6th out of 33 geothermal plants in California and 9th out of 70 nationally.
Grid Region
California (non-ISO)
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Imperial Irrigation District (IID)
Grid Voltage
92.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
37.1K MWh
Latest Month
384.9K MWh
Annual Generation
47.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
89 lb/MWh
NOx
0.001 lb/MWh
SO₂
0.000 lb/MWh
CH₄
—
N₂O
—
Capacity Factor
19.0%
Annual Net Gen
250 GWh
CO₂eq
89 lb/MWh
Subregion
WECC Southwest
2013
$2,851/kW
Est. Construction Cost
Total estimated cost: $260.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 5 articlesGeothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Geothermal 1
Data tables and metrics from the InfraSure database.
Heber Geothermal
Data-driven briefing on Heber Geothermal — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.