Search plants, projects, owners, and states
192 MW Hydro operating in Concordia, LA
192 MW
Nameplate Capacity
8
Generators
units
Conventional Hydroelectric
Technology
1990
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
31.0881, -91.6188
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Concordia, LA
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 65.676 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | First National Bank-Commerce | First National Bank-Commerce | — |
| Owner(s) | First National Bank-Commerce | Brookfield Renewable Partners LP | — |
| Status | Operating | operating | — |
The Sidney A. Murray Jr. Hydroelectric Station, also known as Louisiana Hydroelectric, opened in response to a need for a non-polluting, less-costly power source for Vidalia, Louisiana. A site approximately 40 miles south of the town was selected for the new facility. The 192 MW plant started full-scale operations in 1990. It was designed to rely on the Mississippi River's natural flow and elevation drop at the Old River Control Structure, therefore not needing a large impound dam. It was also built in accordance with the U.S. Army Corps of Engineers existing water management objective with minimal impacts on the surrounding environment. The station operates more continuously than most run-of-the-river hydro plants, with a capacity factor of approximately 55% and an estimated availability in excess of 99%.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Sidney A. Murray Jr. Hydroelectric Station is a 192 MW hydroelectric power plant located in Concordia County, Louisiana. The plant began operating in 1990 and utilizes conventional hydroelectric technology. It consists of 8 generators and is owned and operated by First National Bank-Commerce. The plant's primary fuel source is water (WAT).
In the most recent year with available data, the plant generated 885,203 MWh of electricity, achieving a capacity factor of 52.6%. The Sidney A. Murray Jr. Hydroelectric Station is the largest hydroelectric plant in Louisiana and ranks 98th out of 194 hydroelectric plants nationally. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and is located in the SERC NERC region. Financial data is available for the plant from FERC filings.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
53.0K MWh
Latest Month
885.2K MWh
Annual Generation
52.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Run-of-river hydro · Catalyst Old River Hydroelectric Limited Partnership · Data from 2015–2020
$0.0/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
LOUISIANA.HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Louisiana in Louisiana growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Louisiana 1
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Hydro Plant
Data tables and metrics from the InfraSure database.
Sidney A Murray Jr Hydroelectric
Data-driven briefing on Sidney A Murray Jr Hydroelectric — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.