32.1 MW Muni. Waste operating in Montgomery, PA
32.1 MW
Nameplate Capacity
1
Generators
unit
Municipal Solid Waste
Technology
1991
Operating Since
Coordinates
40.0967, -75.3103
County
Montgomery, PA
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Reworld Waste LLC | Reworld Plymouth | — |
| Owner(s) | Reworld Waste LLC | EQT | — |
| Status | Operating | operating | — |
Reworld Plymouth LLC is a 32.1 MW waste-to-energy plant located in Montgomery County, Pennsylvania. The plant began operating in 1991 and utilizes municipal solid waste (MSW) as its primary fuel source. It consists of a single generator. The facility is owned by EQT, a company based in Sweden, and operated by Reworld Waste LLC.
In the most recent year of reported data, Reworld Plymouth generated 212,787 MWh of electricity, achieving a capacity factor of 75.7%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Among MSW plants in Pennsylvania, Reworld Plymouth ranks 5th out of 6 in terms of capacity, and it ranks 30th out of 56 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Commercial Non-CHP
20.8K MWh
Latest Month
212.8K MWh
Annual Generation
75.7%
Capacity Factor
CO₂ Intensity
2114 lb/MWh
NOx
0.377 lb/MWh
SO₂
3 lb/MWh
CH₄
1 lb/MWh
N₂O
0.173 lb/MWh
Capacity Factor
65.2%
Annual Net Gen
183 GWh
CO₂eq
2197 lb/MWh
Subregion
RFC East
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $112.2M
Market Position
ISO/RTO Market
PJM
LMP Node
PECO
Pricing Hub
WESTERN HUB
Location Type
ZONE
Node Source
EIA-860 direct report
No news articles linked yet for this plant.