44 MW Wood Waste operating in Wexford, MI
44 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
2020
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
44.2621, -85.4360
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Wexford, MI
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
4 mapped line sections connect the two facilities over 4.496 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cadillac Renewable Energy LLC | Cadillac Renewable Energy | — |
| Owner(s) | Cadillac Renewable Energy LLC | I Squared Capital Advisors | — |
| Status | Operating | retired | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Cadillac Renewable Energy is a 44 MW biomass power plant located in Wexford County, Michigan. The plant, which began operating in 2020, utilizes wood and wood waste as its primary fuel source. It consists of a single generator and is operated by Cadillac Renewable Energy LLC, a subsidiary of I Squared Capital Advisors. The plant is interconnected with the Midcontinent Independent Transmission System Operator (MISO) and falls within the ReliabilityFirst Corporation (RFC) NERC region.
In its most recent year of operation, Cadillac Renewable Energy generated 135,689 MWh of electricity, achieving a capacity factor of 35.1%. Among biomass plants in Michigan, it is ranked as the largest of 6 facilities in the state, and it is ranked 26th out of 97 similar plants nationwide.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
46.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
12.8K MWh
Latest Month
135.7K MWh
Annual Generation
35.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
3 lb/MWh
SO₂
0.963 lb/MWh
CH₄
1 lb/MWh
N₂O
0.195 lb/MWh
Capacity Factor
34.0%
Annual Net Gen
131 GWh
CO₂eq
93 lb/MWh
Subregion
RFC Michigan
2020
$2,886/kW
Est. Construction Cost
Total estimated cost: $127.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
CONS.CADILAC
Pricing Hub
MICHIGAN.HUB
Node Source
Curated node match
1 buyer • 1 active contract
Last updated 2026-03-26
View all articlesMichigan in Michigan growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Michigan Wind 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Sky High Solar
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Cadillac Renewable Energy
Data-driven briefing on Cadillac Renewable Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.