84.7 MW Natural Gas Steam Turbine (39 MW) + Wood/Wood Waste Biomass (46 MW) operating in Richmond, GA
84.7 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Natural Gas Steam Turbine + Wood/Wood Waste Biomass
1960
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.3289, -81.9528
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Richmond, GA
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 0.486 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clearwater Paper Corporation - Augusta | Clearwater Paper Corp | — |
| Owner(s) | Clearwater Paper Corporation - Augusta | Clearwater Paper | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Clearwater Paper Corporation - Augusta plant is located in Richmond County, Georgia. The facility, owned and operated by Clearwater Paper, has a total capacity of 84.7 MW across three generators. The plant commenced operations in 1960 and utilizes a hybrid generation approach, incorporating both natural gas steam turbines and wood/wood waste biomass as primary fuel sources. The plant operates within the Southern Company Services, Inc. - Trans balancing authority and the SERC NERC region.
In the most recent year of data, the plant generated 366,954 MWh of electricity, achieving a capacity factor of 49.3%. The Clearwater Paper Corporation - Augusta plant is a significant biomass facility, ranking as the largest of 7 such plants in Georgia and 5th out of 97 nationally.
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southern Company Services, Inc. - Trans (SOCO)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
32.1K MWh
Latest Month
367.0K MWh
Annual Generation
49.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
173 lb/MWh
NOx
0.833 lb/MWh
SO₂
2 lb/MWh
CH₄
0.092 lb/MWh
N₂O
0.024 lb/MWh
Capacity Factor
51.6%
Annual Net Gen
383 GWh
CO₂eq
182 lb/MWh
Subregion
SERC South
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $296.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 7 articlesGeorgia Power at Wadley GA
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Clearwater Paper APP CB
Data-driven briefing on Clearwater Paper — fleet, generation, financial, and news signals.
Georgia Power at Swainsboro
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Jakin GA PV
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.