Search plants, projects, owners, and states
2.5 MW Bio. Gas out of service in Hillsborough, FL
2.5 MW
Nameplate Capacity
5
Generators
units
Other Waste Biomass
Technology
1986
Operating Since
Coordinates
27.9389, -82.4389
County
Hillsborough, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tampa Wastewater Department | — | — |
| Owner(s) | Tampa Wastewater Department | — | — |
| Status | Out of service | — | — |
The Howard F Curren Advanced Wastewater Plant is a 2.5 MW power plant located in Hillsborough County, Florida. The plant began operating in 1986 and is owned and operated by the Tampa Wastewater Department. It utilizes other waste biomass (OBG) as its primary fuel source and consists of five generators.
The plant operates within the Tampa Electric Company balancing authority and the SERC NERC region. According to available data, it is the second-largest power plant of its type in Florida, and ranks 39th nationally among facilities using similar technologies.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tampa Electric Company (TEC)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $8.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Howard F Curren Advncd Wastewater PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.